Heysham 400kV HIS Support Access Platforms

Had-Fab are coming to the final phases of a project for Siemens T&D Ltd. involving the design, fabrication and erection of HIS (Highly Integrated Switchgear) support access platforms for a 400kV substation at Heysham, Lancashire.

Our design and detailing department prepared the design before creating a TEKLA Structures 3D CAD model from which the detail, fabrication and general arrangement drawings were created. The production department used the model to generate the necessary files to be sent to our workshop where the fabrication took place.

We were also contracted to install the structure on site and this was started in June 2012.